Benjamin Moore hand-picked Global Com to assist with their low-voltage needs. They needed an efficient and dependable solution in a short amount of time. Global Com met their tightly-wound requirements by providing, installing, terminating, testing and labeling multiple Cat6 cable, Cat6 RJ-45 jacks, WAPs, RG-6 and OS2 single-mode fiber optic cable. This enabled the site for CATV connectivity, wireless/hotspot and individually owned device connectivity. Global Com completed the project over a 5 week period, with the implementation of a 20 Year Commscope manufacturer’s warranty for workmanship and materials used to complete the project.